Regional Hospital LOX Upgrade
Complete replacement of dual 6,000-gallon liquid oxygen tanks and vaporizer arrays without interrupting facility supply. Project included new telemetry and VIP routing.
Result: Increased capacity by 40% and eliminated winter vaporizer freeze-ups.
Aerospace Test Stand VIP Install
Engineered and installed 400 feet of custom vacuum insulated piping for liquid hydrogen transfer to a rocket engine test stand.
Result: Achieved sub-1% boil-off rate during transfer operations.
Food Processing Plant Optimization
Diagnosed two-phase flow issues in a liquid nitrogen flash-freezing tunnel. Redesigned manifold and installed subcoolers.
Result: Reduced LIN consumption by 15% and increased throughput line speed.
Emergency LNG Pump Rebuild
Responded to catastrophic centrifugal pump failure at a peak-shaving facility. Extracted, rebuilt, and reinstalled within 72 hours.
Result: Restored facility to full operational status ahead of winter storm demand.